AtlasEdge Expands into Portugal, Commences 20 MW Development in Lisbon

AtlasEdge plans to invest more than EUR 500 million in the coming years in Portugal.

Highlights

  • AtlasEdge announces entry into the Portuguese market with the acquisition of two sites in Lisbon.
  • AgileEdge design combines modular construction and smart supply chain management for flexible high-density deployments.
  • AtlasEdge said once fully operational, both sites will run on renewable power.

Follow Us

AtlasEdge Expands into Portugal, Commences 20 MW Development in Lisbon
European Edge data center provider AtlasEdge is planning to develop data centers in Portugal. The company announced its entry into the Portuguese market this week with the acquisition of two adjacent sites in Lisbon that will deliver more than 20 MW of IT load. The sites are located in Carnaxide, within the Lisbon Metropolitan Area, a highly strategic destination in close proximity to Carcavelos, the landing point for multiple subsea cables. This location enables customers to leverage the subsea gateway to Africa, Latin America, and the rest of Europe, AtlasEdge said.

Also Read: AtlasEdge Launches New Tier 3 Data Centre in Leeds




AtlasEdge Entry into Portugal

AtlasEdge plans to invest more than EUR 500 million in the coming years in Portugal. According to the company's LinkedIn update, the company has broken ground and commenced the construction of the data centers in Lisbon, but timelines for launch weren't shared.

"Our entry into the Portuguese market provides us with a key foothold in one of Europe's emerging tech hubs and a market where demand for capacity is rapidly outstripping supply," AtlasEdge said. "The progress we have made to date has been remarkable, and our push into the Lisbon market represents a continuation of our bold and agile approach."

Also Read: Datacenter One Launches New Data Center Near Hamburg

Proprietary AgileEdge Design

Both sites will be delivered by AgileEdge, a proprietary design AtlasEdge has developed that uses a mix of modular construction, traditional onsite build, and smart supply chain management. All AgileEdge facilities are designed to flexibly support high-density deployments – in any room, and any rack, the company said.

Sustainable Operations

AtlasEdge said once fully operational, both sites will run on renewable power and will be able to recover and reuse 100 percent of waste heat.

Also Read: AtlasEdge Enters Austria With Data Center Acquisition in Vienna

Recent Developments

With this announcement, AtlasEdge's European footprint spans 20 different metros across 13 countries. The company's expansion into Lisbon adds to recent announcements of new sites in Hamburg and Leeds, as well as an acquisition in Vienna earlier this year, as reported by TelecomTalk.

Reported By

Telecom Analyst

Passionately following the Indian #Telecom Industry for over a decade from Business, Consumer and a Technical perspective. My primary focus area is Consumer & Digital Experience.

Recent Comments

TheAndroidFreak :

Off Topic :Nothing Phone 3

OnePlus 13 and Xiaomi 15 to Feature Qualcomm Snapdragon 8…

rks :

Kahan kahan kiya Bhai Mera village Aaj bhi tujhe pukare jo 2g lagaya h usko 4g kar de Zara.

Vi Added 100 Towers Every Hour to Expand Network

TheAndroidFreak :

Off Topic: REDMI Turbo 4 Spotted on BIS Certification with model no 2412DPC0AI 6.67",1.5K Resolution 120HZ Refresh Rate MTK Dimensity…

OnePlus 13 and Xiaomi 15 to Feature Qualcomm Snapdragon 8…

TheAndroidFreak :

Off Topic: Poco F7 Ultra camera 50MP Light Hunter 800 1/1.55" OIS Primary 32MP 120° FOV Ultra-wide 50MP JN5 1/2.76"…

OnePlus 13 and Xiaomi 15 to Feature Qualcomm Snapdragon 8…

TheAndroidFreak :

Off Topic : Battery life will be crazy. ??

OnePlus 13 and Xiaomi 15 to Feature Qualcomm Snapdragon 8…

Load More
Subscribe
Notify of
0 Comments
Inline Feedbacks
View all comments