BSNL Awards Rs 94.35 Crore Project to Pace Digitek Subsidiary

Lineage Power will supply BSNL with 25,000 lithium-ion battery modules rated at 100 AH/48V, along with 2,500 IP55-rated equipment racks designed for both outdoor and indoor deployment.

Most readers read for free. A small group from the TelecomTalk community keeps this going. Support only if our work adds value for you.

Highlights

  • BSNL, a state-run telecom operator, has awarded a Rs 94.35 crore project to a Pace Digitek Limited's subsidiary Lineage Power Private Limited.
  • This project/order is to strengthen the power and energy storage infrastructure across the telco's network in India.
  • As per the government mandaged law, all the Battery Management Systems supplied under the order will have to be registered on the Trusted Telecom Portal.

Follow Us

bsnl awards rs 9435 crore project digitek

Bharat Sanchar Nigam Limited (BSNL), a state-run telecom operator, has awarded a Rs 94.35 crore project to a Pace Digitek Limited's subsidiary Lineage Power Private Limited. This project/order is to strengthen the power and energy storage infrastructure across the telco's network in India. Lineage Power will supply BSNL with 25,000 lithium-ion battery modules rated at 100 AH/48V, along with 2,500 IP55-rated equipment racks designed for both outdoor and indoor deployment.




Read More - COAI Concerned About Technical Evaluation of D2M Broadcasting

Lineage Power will configure the supplied systems into battery banks with capacities ranging from 300 AH to 1,200 AH, supporting the operational requirements of telecom sites across diverse conditions. This order by BSNL includes a comprehensive five-year warranty, followed by a five-year Annual Maintenance Contract (AMC).

This contract between the companies is intended to ensure that there's uninterrupted operation and its crictical power infrastructure continues to operate smoothly over a 10 year period.

Read More - Reliance Jio’s Rs 2025 Plan in 2026

As per the government mandaged law, all the Battery Management Systems supplied under the order will have to be registered on the Trusted Telecom Portal. The government wants all the critical telecom infrastructure in the country to get approved by the Trusted Telecom Portal, so that in under no circumstances, a cyber warfare can't affect India, its power grids, or communication lines.

In line with this, the government, in fact, removed all the Chinese vendors from the network. This order will take some time be executed by the Lineage Power Private Limited. It will happen in a phase wise manner over a period of five months.

Most readers read for free. A small group from the TelecomTalk community keeps this going. Support only if our work adds value for you.

Reported By

Tanuja is a passionate technology and telecom buff who has been following the telecom industry for several years now.

Recent Comments

Tanay Singh Thakur :

Thanks Sujata.

Jio is Offering 84 Days of Validity for Just Rs…

sudhakar :

The speed that you are getting in the Indian 5G network is the true 4G speed and the 4G speed…

Jio 5G is Free, But is it Really Unlimited

Faraz :

Meanwhile Vi 99 plan in C circles

BSNL Rs 99 Plan in 2026

Sujata :

Can't agree more, payGo option was too good in this matter. Everything you wrote is true. Telecom business has evolved…

BSNL CMD Confirms 4G Expansion

Sujata :

I think it is NSG (network signal guru)

BSNL CMD Confirms 4G Expansion

Load More
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments