Industry Needs Web-Based Automatic and Timely Approval Process for 5G Preparedness: COAI

Follow Us

The Cellular Operators Association of India (COAI) on Monday said the industry needed a web-based automatic and timely approval process for Right of Way (ROW) for the country to be prepared for 5G connectivity. Right of Way refers to the legal right, established by usage or grant, to pass along a specific route through grounds or property belonging to another. In terms of the telecom industry, it refers to the right to establish infrastructure such as towers and fibre cables.

coai-5g-timely-rollout




Speaking to the reporters of IANS, Rajan Mathews, Director General of the industry body said that there should be no restriction on tower installations as it affects coverage and quality of services of telecom networks.

"Need web-based automatic and timely approval process for ROW for 5G preparedness wherein approximately 1,000 BTS (Base Transceiver Station) are required per square kilometre," according to a COAI presentation.

COAI sought a single window clearance for setting up infrastructure in a time-bound manner and a one time "nominal" administration fee. It further asked for the alignment of all state telecom infrastructure policies with the Department of Telecommunications' RoW Rules, 2016.

Lack of telecom towers and optical fibre, according to Mathews is a major reason of call drops in the country. Other reasons for call drop include "congestion (overloaded cell sites)", weather condition which affects microwave links, faulty handsets, shutting down of mobile towers and sealing by local authorities, the COAI presentation showed.

Recent Comments

Viren :

Vi have less network coverage. No 5G. To compensate that they must keep their plan prices 15 to 20% less…

Vodafone Idea Reports Rs 6,609 Crore Loss, Plans 5G Rollout…

TheAndroidFreak :

Mumbai Goa highway, rural area, CA is active. Airtel is non existent here.

Vodafone Idea Reports Rs 6,609 Crore Loss, Plans 5G Rollout…

TheAndroidFreak :

I shared the link of same, but approval is not there from moderators. That antenna supports 600Mhz-4000Mhz frequency. So it's…

Vodafone Idea Reports Rs 6,609 Crore Loss, Plans 5G Rollout…

TheAndroidFreak :

Off Topic:Vivo V50 Indian pricing 34,999? ~ 8+128GB 36,999? ~ 8+256GB 40,999? ~ 12+256GB

Vodafone Idea Reports Rs 6,609 Crore Loss, Plans 5G Rollout…

Load More
Subscribe
Notify of
guest

2 Comments
newest
oldest most voted
Inline Feedbacks
View all comments