Operators raise technical issues of full MNP with DOT seeks more time to implementation, will this cause any delay?

Follow Us

mobile-usingIn a letter to DOT, COAI and AUSPI representing all private mobile operators in India raised technical issues of implementing full MNP. On 25th February, TRAI had issues Telecommunication MNP (Sixth Amendment) Regulations, 2015 and stated that full MNP has to be implemented by 3rd May 2015.

As per COAI and ASUPI, the changes required to implement full MNP are complex and across multiple systems and require much more time. In the letter, they have pointed out the following issues with implementing full MNP.




1. Dialing Pattern post MNP

Currently, STD numbers can only be dialed by adding either '0' or '+91' as the prefix. Post full MNP the dialling pattern would be simplified and both STD and local numbers can be dialed with or without any prefix. These changes require configuration modifications in each of the operator nodes, in all circles and testing to ensure that there are no impacts. Therefore, it may take at least 2 months at the operator end to complete this activity.

2. Call forwarding

In current setup, the network checks to bar STD forwarding on the basis of number series. But post full MNP, this check will be redundant and call forwarding to pan-India numbers would be possible. Post full MNP, call forwarding should be opened for all type of operators, within and outside the service areas. Accordingly, BSNL should also revise their agreement with the operators.

3. STD Barring

STD barring will also be an issue post implementation of Full MNP. There should be no STD barring for mobile destinations Post Full MNP implementation.

COAI and ASUPI want above issues to be addressed by DOT before implementing full MNP. As the timelines for the implementation of Full MNP is very tight, operators are already moving ahead and making the network and IT level changes before the deadline.

Do you think operators can implment FULL MNP on time do let us know via comments.

Reported By

An IT professional who has got great passion for telecom. Has been closely watching Indian telecom space since 2009.

Recent Comments

Faraz :

If they already reached 482 million, I wonder in how many months it will reach 500 million customers. Their ARPU…

Reliance Jio Posts Rs 5583 Crore Net Profit in Q4…

Faraz :

Vi just showing their greedy face more than ARPUtel these days. With minimum spectrum and network, they want to take…

Vodafone Idea Needs Tariff Hikes: Analysts

PARAG SHAH :

it would be harakari for vodafone to increase tariff, as it will only benifit 5g players

Vodafone Idea Needs Tariff Hikes: Analysts

Faraz :

That is good enough speed as per 4G standard, and you get cheaper plan. You could dial *#0011# and show…

BSNL 4G Services to be Rolled Out Soon in Indore:…

ansarshaikh :

Tested BSNL 4G, on Band 28 coverage is best, speed also 10mbps to 40mbps with 10mHz

BSNL 4G Services to be Rolled Out Soon in Indore:…

Load More
Subscribe
Notify of
12 Comments
newest
oldest most voted
Inline Feedbacks
View all comments