DOT rejects proposal for E-GSM on 800 MHz CDMA band, What it means to CDMA and GSM Operators?

Follow Us

mobile-tower-indiaDepartment of Telecommunications (DOT) has rejected the proposal of Telecom Regulatory Authority of India (TRAI) to create extended-GSM by splitting the 800 MHz CDMA spectrum. DOT will decide the price of the 800 MHz band in the next telecom commission meeting scheduled on November 7. TRAI's proposal to create e-GSM band was strongly opposed by the CDMA and dual technology operators, but was heavily backed by GSM players. Lets take a look at how this would impact Indian mobile segment.

What is e-GSM?

E-GSM stands for extended GSM band in the 900 MHz range which overlaps with the 800 MHz band. Extended GSM includes the standard GSM 900 band (GSM-P) with an addition of 10 MHz at the lower side of the primary GSM 900 MHz band. This extension ranges from 880-890 MHz. Most modern phones with GSM 900 also support e-GSM.




What does this mean to the CDMA players?

This will be a great relief to the CMDA operators as this move will ensure there will be enough spectrum for them. As per CDMA operators, they have invested billions in building CDMA infrastructure in the country and any move to make e-GSM will grossly undermine their business case

How will this impact the GSM operators?

E-GSM band would have added additional 10 MHz to the 900 MHz GSM band. So GSM operators would have had more 900 MHz spectrum to bid for. Most operator's 900 MHz license is going to expire in 2015-2016 and they will have to win it back in the next auction. Recently Airtel, Idea, Vodafone and Reliance had written a letter to the telecom minister and prime minister to postpone the next auction till enough spectrum is available.

900 MHz is the most efficient spectrum in the GSM band as it provides strongest coverage compared to the 1800 MHz GSM band. GSM operators could also deploy 3G service over this band as with Idea in Delhi which plans to offer 3G service over 900 MHz spectrum they had won back in February.

How will this affect consumers?

For CDMA users this would mean that CDMA operators MTS, Reliance and Docomo will be able to purchase additional spectrum to expand their service and further improve Rev B EVDO speeds with additional carrier frequency.

For GSM users, e-GSM would have created an additional 10 MHz which would have meant at least two more operators having 900 MHz spectrum. Currently only BSNL/MTNL and two or three private operators have 900 MHz spectrum in each circle. Additional operators would have brought the total tally of operators to 5 or 6 in the 900 MHz range. They could have launched 3G in the 900 MHz, which would have provided twice the coverage than the current 3G in the 2100 MHz.

Reported By

An IT professional who has got great passion for telecom. Has been closely watching Indian telecom space since 2009.

Recent Comments

Faraz :

BSNL can never compete with Airtel 's NSA 5G, forget Jio SA 5G. But they could get some customers if…

Let’s Talk: BSNL’s Delays in Launching 4G is Leading to…

Shivraj Roy :

just yesterday i took a airtel postpaid sim for my sister and had the 399rs plan ,i dont see any…

Airtel Hits 3 Million 5G Users Milestone in Mumbai

Faraz :

Mumbai was strong circle for Vi till 2023. Due to lack of 5G, they be loosing by huge number.

Airtel Hits 3 Million 5G Users Milestone in Mumbai

Faraz :

BSNL has 2G on B8 and it will stay like that until 4G is rolled out in every state. There…

Let’s Talk: BSNL’s Delays in Launching 4G is Leading to…

TheAndroidFreak :

BSNL 5G can wait as they cannot compete with Jio 5G yet without backhaul and coverage. So they should focus…

Let’s Talk: BSNL’s Delays in Launching 4G is Leading to…

Load More
Subscribe
Notify of
24 Comments
newest
oldest most voted
Inline Feedbacks
View all comments